Project duration
October 11 - 14 2019
Role
Designer and developer. Site is built on Hugo with TailwindCSS.
Background
Again, this may have been the fastest turnaround on a site I've ever done. I designed and built the site in three days.
October 11 - 14 2019
Designer and developer. Site is built on Hugo with TailwindCSS.
Again, this may have been the fastest turnaround on a site I've ever done. I designed and built the site in three days.